Hoists
Material hoists, and hoists with passenger carriage wherever people have to go up several times a day.
Scaffolding and hire
Anton Muckel Gerüstbau GmbH erects facade and interior scaffolding, temporary roofing and special structures. The firm is based in Linnich and works across the Heinsberg district, Geilenkirchen and all of its quarters included.
Scaffolding is the workplace of every other trade. It decides how quickly a roof is covered, a facade rendered or a window set, and it decides how safely that can be done. We survey the building, plan the structure around what is actually there, and hand over something the build programme can rely on.
Chapter 01
The firm covers the whole scaffolding programme. A house in Hünshoven is surveyed exactly as a hall on an industrial estate is: the building first, the structure after it.
The standard structure on houses, apartment blocks and office buildings. Surveyed on site, erected along the facade, with decking and edge protection on every lift.
Full area working decks inside, for ceilings, halls, stairwells and refurbishment, wherever the whole floor plan has to be worked over.
Working decks hung from above wherever nothing can be stood up from below, over water, over a traffic route or under a structure.
Rolling structures for short jobs, for work that travels along the building.
System scaffolding for irregular plans, extensions, bays and everything that refuses to sit on a grid.
Load bearing structures for high loads, for propping and for components that need support for a while.
Structures inside a working plant, at vessels, installations and halls, planned around access, routes and operating hours.
Weather protection over the site, so that an open roof or an open facade does not have to wait for the next dry week.
Platforms and stands for events, assembled from scaffolding components and laid out for the planned build.
Stair units as access to the structure and as a second way out when the usual route is closed.
Everything with no standard measure: bridging spans, free spanning sections, connections into existing buildings.
Hoists with and without passenger carriage, telehandlers with a range of attachments, and lorries with a loader crane and container body.
Does your project fit? Write a line about what is coming up.
Send enquiryChapter 02
Not every site has a load bearing surface beneath it. Over a watercourse, over an embankment, over a carriageway or over a track, the working deck has to become the structure itself. That is what a special structure is for.
Structures like these do not come out of a catalogue. They are surveyed on the object, assembled from lattice girders, propping and modular components, and tied into what is already standing. The photographs show a temporary walkway taken across a watercourse beside an existing bridge: lattice girders as the frame, a continuous steel deck, handrails on both sides, a connection to each bank.
Discuss a difficult case
Send enquiryChapter 03
Five steps, from the first message to a cleared site. The order never changes; the effort in each step does.
You write what is coming up: the building, the rough height, the planned period. One photograph of the facade helps more than any description.
We look at the place itself: access, ground, projections, services, boundaries. What can be erected follows from that.
You get the scope, the standing time and the date in writing. Only then is the job scheduled.
The structure is erected, checked and handed over. You know what it carries and how it is entered.
At the end of the standing time it is struck and the area cleared. One call is enough.
Chapter 04
On a building with cornices, pilaster strips and old masonry, the question is not where the scaffolding should go but where it must not be tied.
Brick, dressed stone and old render do not take an anchor just anywhere. Projections, eaves and existing outbuildings set out the structure, and work often has to run while the place stays in use, because an entrance or a platform is to remain open. The photograph shows facade scaffolding on a historic brick building, erected over an existing canopy.
Chapter 05
Material has to go up, and it has to come down again. The firm hires out its own equipment for that, with or without a scaffold.
Material hoists, and hoists with passenger carriage wherever people have to go up several times a day.
With a range of attachments, for loads that will reach their place neither by hand nor on a forklift.
With a container body, for delivery, repositioning and removal in one run.
Equipment is hired to trades and to private clients. What is needed is settled beforehand on the telephone.
Ask about equipment
Send enquiryChapter 06
Write briefly what is coming up. The more precisely the building, the height and the period are described, the more solid the answer will be.
A call settles a great deal faster than a form. The firm can be reached on the number in the legal notice.
+49 2462 2822Chapter 07
The firm is based in Linnich. From there the Heinsberg district is served, and Geilenkirchen is among the places reached regularly.
If your building sits just outside this list, ask anyway. Whether a site is served follows from the scope, not from a boundary line.
Chapter 08
Facade, interior, suspended, mobile, modular, heavy duty and industrial scaffolding, together with temporary roofing, staging, stair tower units and escape stairs, and special structures.
Yes. Where there is no load bearing surface beneath, bridging spans and propping are built from lattice girders and modular components. The photographs in the chapter on special structures show one such temporary walkway over a watercourse.
Yes. With brick, dressed stone and old render the ties follow what the building itself allows, and projections or canopies are spanned rather than removed.
We reply once the enquiry has arrived. We do not name a fixed deadline, because it depends on the workload and on the scope. If it is urgent, please call.
Yes. Hoists with and without passenger carriage, telehandlers with a range of attachments, and lorries with a loader crane and container body can be asked for separately.
From the registered office at Im Gansbruch 22, 52441 Linnich. The Heinsberg district is served from there, with Geilenkirchen and the surrounding towns.
Anton Muckel Gerüstbau GmbH
Im Gansbruch 22
52441 Linnich
Deutschland
Sylvia Muckel
VAT identification number under section 27 a of the German VAT Act
DE212749024
Sylvia Muckel
Im Gansbruch 22, 52441 Linnich
The content of these pages was prepared with care. No warranty is given for its accuracy, completeness or currency. The operator of a linked site is responsible for its content; at the time the link was set, no unlawful content was apparent there.
The texts, photographs and layouts published on this site are protected by German copyright law. Any use beyond the limits of copyright requires permission.
When this page is loaded, the hosting provider processes technical access data such as the IP address, the time, the file requested and the browser type transmitted. This processing is necessary in order to deliver the page and rests on Article 6 (1) (f) GDPR.
A single cookie is set: site_lang. It holds only the code of the language you chose, that is de, en, pl or ru, lasts one year and is set with SameSite=Lax. It is strictly necessary within the meaning of section 25 (2) no. 2 TDDDG and therefore needs no consent. No audience measurement takes place, no third party services are loaded and no profiles are built.
What you enter in the form is transmitted to us and processed solely in order to deal with your enquiry. The legal basis is Article 6 (1) (b) or (f) GDPR. The entries are deleted once they are no longer needed and no retention duty stands in the way.
You have the right of access, rectification, erasure, restriction of processing, data portability and objection. Please write to the address given in the legal notice. You also have the right to lodge a complaint with a data protection supervisory authority.
Only site_lang. It stores the code of the language you chose, that is de, en, pl or ru. It lasts one year, path /, SameSite=Lax. This site sets no other cookie.
The language switcher writes the code, and each language version writes its own code when it loads. The start page reads the value first: if it holds en, pl or ru, the start page takes you to that version once. If it holds de, holds nothing, or holds something unknown, the German start page stays where it is.
No audience measurement, no advertising identifiers, no maps, fonts or videos pulled from other servers. Your IP address is not evaluated and your browser language is not read.
Delete site_lang in your browser settings. The start page will then show the German version again until you choose a language once more.