Skip to the content
Anton Muckel Gerüstbau GmbH
Anton Muckel Gerüstbau GmbH

Scaffolding and hire

Scaffolding in Geilenkirchen and the Heinsberg district

Telephone +49 2462 2822

Anton Muckel Gerüstbau GmbH erects facade and interior scaffolding, temporary roofing and special structures. The firm is based in Linnich and works across the Heinsberg district, Geilenkirchen and all of its quarters included.

A temporary walkway over a watercourse, carried on lattice girders, with a steel deck and handrails on both sides.

From the survey to the strike

Scaffolding is the workplace of every other trade. It decides how quickly a roof is covered, a facade rendered or a window set, and it decides how safely that can be done. We survey the building, plan the structure around what is actually there, and hand over something the build programme can rely on.

Based in
Linnich, Düren district, on the boundary of the Heinsberg district
Erected
Facade, interior, suspended, modular, heavy duty, industrial
Alongside
Temporary roofing, staging, special structures, equipment hire

Chapter 01

What gets erected in Geilenkirchen

The firm covers the whole scaffolding programme. A house in Hünshoven is surveyed exactly as a hall on an industrial estate is: the building first, the structure after it.

01

Facade scaffolding

The standard structure on houses, apartment blocks and office buildings. Surveyed on site, erected along the facade, with decking and edge protection on every lift.

02

Interior scaffolding

Full area working decks inside, for ceilings, halls, stairwells and refurbishment, wherever the whole floor plan has to be worked over.

03

Suspended scaffolding

Working decks hung from above wherever nothing can be stood up from below, over water, over a traffic route or under a structure.

04

Mobile towers

Rolling structures for short jobs, for work that travels along the building.

05

Modular scaffolding

System scaffolding for irregular plans, extensions, bays and everything that refuses to sit on a grid.

06

Heavy duty scaffolding

Load bearing structures for high loads, for propping and for components that need support for a while.

07

Industrial scaffolding

Structures inside a working plant, at vessels, installations and halls, planned around access, routes and operating hours.

08

Temporary roofing

Weather protection over the site, so that an open roof or an open facade does not have to wait for the next dry week.

09

Staging

Platforms and stands for events, assembled from scaffolding components and laid out for the planned build.

10

Stair towers and escape stairs

Stair units as access to the structure and as a second way out when the usual route is closed.

11

Special structures

Everything with no standard measure: bridging spans, free spanning sections, connections into existing buildings.

12

Equipment hire

Hoists with and without passenger carriage, telehandlers with a range of attachments, and lorries with a loader crane and container body.

Does your project fit? Write a line about what is coming up.

Send enquiry

Chapter 02

When there is no ground under the structure

Not every site has a load bearing surface beneath it. Over a watercourse, over an embankment, over a carriageway or over a track, the working deck has to become the structure itself. That is what a special structure is for.

Structures like these do not come out of a catalogue. They are surveyed on the object, assembled from lattice girders, propping and modular components, and tied into what is already standing. The photographs show a temporary walkway taken across a watercourse beside an existing bridge: lattice girders as the frame, a continuous steel deck, handrails on both sides, a connection to each bank.

Bridging
Free spans over ditches, watercourses and paths, carried on lattice girders instead of props standing in the water.
Propping
Load transfer where nothing may be stood up, for instance over an entrance that has to stay open.
Tying into what is there
Ties and bearings on the existing building, planned around whatever stays in place.
Access
A safe route onto the deck, with handrails and slip resistant decking over the whole length.
The way onto the walkway from the bank, decking and handrail continuous as far as the connection.
The lattice girder frame under the decking, with the handrail of the existing wooden bridge beside it.

Discuss a difficult case

Send enquiry

Chapter 03

How a structure comes about

Five steps, from the first message to a cleared site. The order never changes; the effort in each step does.

  1. 01

    Enquiry

    You write what is coming up: the building, the rough height, the planned period. One photograph of the facade helps more than any description.

  2. 02

    Survey on site

    We look at the place itself: access, ground, projections, services, boundaries. What can be erected follows from that.

  3. 03

    Quotation and date

    You get the scope, the standing time and the date in writing. Only then is the job scheduled.

  4. 04

    Erection and handover

    The structure is erected, checked and handed over. You know what it carries and how it is entered.

  5. 05

    Striking

    At the end of the standing time it is struck and the area cleared. One call is enough.

Chapter 04

Older facades need a different structure

On a building with cornices, pilaster strips and old masonry, the question is not where the scaffolding should go but where it must not be tied.

Brick, dressed stone and old render do not take an anchor just anywhere. Projections, eaves and existing outbuildings set out the structure, and work often has to run while the place stays in use, because an entrance or a platform is to remain open. The photograph shows facade scaffolding on a historic brick building, erected over an existing canopy.

Anchors by inspection
Ties are set where the substrate allows it, not where the grid would like them.
Over what is there
Canopies, extensions and external stairs are spanned rather than cleared away.
The place stays open
Entrances, routes and areas that remain in use are left free and protected.
Facade scaffolding above the canopy of a historic brick building, netting at the eaves, the way underneath left open.

Chapter 05

The equipment that belongs with it

Material has to go up, and it has to come down again. The firm hires out its own equipment for that, with or without a scaffold.

Hoists

Material hoists, and hoists with passenger carriage wherever people have to go up several times a day.

Telehandlers

With a range of attachments, for loads that will reach their place neither by hand nor on a forklift.

Lorry with loader crane

With a container body, for delivery, repositioning and removal in one run.

Equipment is hired to trades and to private clients. What is needed is settled beforehand on the telephone.

Ask about equipment

Send enquiry

Chapter 06

Enquiry for Geilenkirchen and the surrounding area

Write briefly what is coming up. The more precisely the building, the height and the period are described, the more solid the answer will be.

This is what helps us

  • Which building is it, and where does it stand?
  • How high does the work reach, and over what period?
  • Is there anything unusual: access, slope, open routes, services?
  • Is it only the scaffold, or equipment as well?

Rather speak to someone

A call settles a great deal faster than a form. The firm can be reached on the number in the legal notice.

+49 2462 2822
required
required
optional
optional
optional
required

Chapter 07

Where we put up scaffolding

The firm is based in Linnich. From there the Heinsberg district is served, and Geilenkirchen is among the places reached regularly.

Quarters of Geilenkirchen

  • Bauchem
  • Beeck
  • Gillrath
  • Grotenrath
  • Hünshoven
  • Immendorf
  • Lindern
  • Prummern
  • Süggerath
  • Teveren
  • Tripsrath
  • Waurichen
  • Würm

Also in the working area

  • Geilenkirchen
  • Übach-Palenberg
  • Gangelt
  • Heinsberg
  • Hückelhoven
  • Baesweiler
  • Aldenhoven
  • Linnich

If your building sits just outside this list, ask anyway. Whether a site is served follows from the scope, not from a boundary line.

Chapter 08

Frequently asked

Call Send enquiry